PROJECT information

Location: Laval 
  
Duration of construction: 24 weeks of production and 60 days of installation
  
Owner:The Cadillac Fairview Corporation.
  
Architect: Groupe Archifin
  
Engineer: Dessau-Soprin / Hybrid Parking Solutions, LLC
  
Contractor: Construction C.A.L.
  
Prefabricated components: 3 above-ground levels including:
 ● 75 columns
 ● 183 internal beams
 ● 564 double T, 388 346 square feet
 ● 120 exterior spandrels, 29 100 square feet

Location: Laval 
  
Duration of construction: 24 weeks of production and 60 days of installation
  
Owner:The Cadillac Fairview Corporation.
  
Architect: Groupe Archifin
  
Engineer: Dessau-Soprin / Hybrid Parking Solutions, LLC
  
Contractor: Construction C.A.L.
  
Prefabricated components: 3 above-ground levels including:
 ● 75 columns
 ● 183 internal beams
 ● 564 double T, 388 346 square feet
 ● 120 exterior spandrels, 29 100 square feet

DESCRIPTION

Built for a major shopping center in Laval, the objective was to capitalize on additional parking spaces while minimizing the impact on the day-to-day operations of the center. It was also the concern of the owners and designers to visually marry the new structure and the existing one. This initiative proved very successful.

This project gave rise to a structural innovation by creating niches in the spandrel beams to embed the legs of the double T.

Built for a major shopping center in Laval, the objective was to capitalize on additional parking spaces while minimizing the impact on the day-to-day operations of the center. It was also the concern of the owners and designers to visually marry the new structure and the existing one. This initiative proved very successful.

This project gave rise to a structural innovation by creating niches in the spandrel beams to embed the legs of the double T.